Interconnection Studies

Know Your Study Results Before the ISO Sends Them

Predictive interconnection analysis across all major ISOs - so you enter the queue with confidence, not surprises.

Queue strategy SIS replication Cost exposure

Trusted across NYISO, PJM, MISO, CAISO, SPP & ERCOT

Interconnection Studies

If This Sounds Familiar - You Need Us

Queue entry uncertainty Risk You're entering the queue blind without pre-study analysis to understand upgrade exposure.
SIS cost surprise Critical System Impact Study returned tens of millions in network upgrades you didn't expect.
Cluster study complexity Deadline FERC Order 2023 cluster studies require coordinated technical strategy within tight timelines.
Affected system exposure Unknown Neighboring utilities flagging your project with thermal or voltage concerns.

Know the answer before the ISO does

Cost Exposure Analysis

Quantify network upgrade cost risk before committing to a queue position.

Rapid Scenario Testing

Evaluate alternative POIs, MW sizing, and technology configurations to optimize results.

Technical Advocacy

Stand beside you at ISO meetings with data-driven positions and defensible analysis.

Engineering capabilities

Feasibility Studies

Independent feasibility analysis before entering ISO queues.

SIS Review & Replication

Replicate and verify ISO system impact study results.

Cost Allocation Analysis

Network upgrade cost allocation reviews and challenges.

Power Flow Studies

Thermal, voltage, and short-circuit analysis with calibrated models.

Affected System Studies

Cluster and neighboring utility impact assessments.

Appeal Support

Data-driven support for interconnection decision appeals.

From feasibility to interconnection agreement

1

Site Screening

Evaluate POI, capacity, and preliminary grid constraints.

GIS + network mapping

2

Pre-Study Analysis

Run independent feasibility and cost exposure scenarios.

Calibrated ISO models

3

Study Replication

Replicate ISO study methodology with internal models.

Thermal + voltage + stability

4

Technical Advocacy

Present data-driven positions at ISO review meetings.

Cost challenge + mitigation

5

Agreement Support

Guide agreement execution and commercial readiness.

LGIA / SGIA coordination

Real projects, real outcomes

122
MW Wind
$18M
Upgrades Avoided
NYISO
Market

Wind Project - NYISO

Independent replication of the system impact study revealed conservative assumptions in the ISO's thermal analysis. Presented data to the ISO review committee, resulting in $18M in network upgrades being removed from the cost allocation - saving the project.

Stop Flying Blind Into the Queue.

Know your upgrade exposure, cost risk, and technical constraints before submitting - not after.

Back to All Services